14
Installation Checklist
IMPORTANT: To ensure a safe and proper installation, review below items directly with installer.
□
Has all shipping tape, string and packing been removed?
□
Has the unit been secured in place with the provided anti-tip bracket or is the unit 1 inch or
less from a solid soffit?
□
Are all levelers extended down to make contact with the floor?
□
Is the unit level?
□
Is the power cord connected directly into a properly grounded 3-prong outlet in accordance
with all applicable local codes?
□
Has all stainless protection film been removed?
□
Are the panel(s) (wood overlays, if used) attached securely and properly?
□
Allow the unit to operate for at least 24 hours before loading products or adjusting
temperature settings.