2 Setup Procedure
2.1 Connect P2 of Fixture with printer port of PC by LPT Cable.
2.2 Connect P1 of Fixture with VA502mb/VA702mb Monitor by VGA Cable.
2.3 Plug Power Adapter to Fixture.
2.4 Connect Power Cord to VA502m/VA702mb Monitor.
2.5 Connect P3 to the Signal Generator (eg.Chroma2326) for verifying it after the operation
being completed.
2.6 Connect PC to the additional monitor.
P2
:
to LPT Cable
JP1
:
to Power Adapter
P1
:
to VGA Cable
P3
:
to Signal Generator
3 Firmware Upgrade Procedure
Step 1. Let VA502mb/VA702mb set to be connected with AC cable and VGA cable.
Step 2.Execute the MSstar ISP tool.
29
ViewSonic Corporation
Confidential - Do Not Copy
VA502mb-1
Summary of Contents for VA502mb-1
Page 10: ...7 ViewSonic Corporation Confidential Do Not Copy VA502mb 1...
Page 13: ...10 ViewSonic Corporation Confidential Do Not Copy VA502mb 1...
Page 14: ...11 ViewSonic Corporation Confidential Do Not Copy VA502mb 1...
Page 16: ...PIN Descriptions 13 ViewSonic Corporation Confidential Do Not Copy VA502mb 1...
Page 18: ...Block Diagram PIN Function 15 ViewSonic Corporation Confidential Do Not Copy VA502mb 1...
Page 38: ...5 7 Packing Procedure 35 ViewSonic Corporation Confidential Do Not Copy VA502mb 1...
Page 42: ...39 ViewSonic Corporation Confidential Do Not Copy VA502mb 1 6 Troubleshooting Flow Chart...
Page 43: ...7 Block Diagram 40 ViewSonic Corporation Confidential Do Not Copy VA502mb 1...
Page 53: ...9 PCB Layout Diagrams MAIN BOARD 50 ViewSonic Corporation Confidential Do Not Copy VA502mb 1...
Page 54: ...POWER BOARD 51 ViewSonic Corporation Confidential Do Not Copy VA502mb 1...
Page 56: ...53 ViewSonic Corporation Confidential Do Not Copy VA502mb 1...
Page 57: ...AUDIO BOARD 54 ViewSonic Corporation Confidential Do Not Copy VA502mb 1...
Page 58: ...KEY BOARD 55 ViewSonic Corporation Confidential Do Not Copy VA502mb 1...
Page 61: ...58 ViewSonic Corporation Confidential Do Not Copy VA502mb 1 Packing for Shipping...