14
2.
Apply adhesive all around the plug. Insert plug.
Note
Adhesive drying time: 24 hours
3.
4.
Fig. 11
Connections on the heating water side
Note
Install all pipe connections free of load and torque stress.
Fig. 12
A
Drain, R 1
¼
B
Female connection for condensate drain, R
½
C
Female connection for boiler water temperature
sensor, high limit safety cut-out and temperature
controller, R
¾
D
Boiler flow
700 and 900 kW:
DN 100
1100 and 1300 kW: DN 125
1600 and 1950 kW: DN 150
E
Female connection for high limit safety cut-out,
R
½
(in place of flash trap)
Combustion chamber sight glass
(cont.)
5457380