background image

10

Fitting a flue pipe

ØD

Ø10

2-3xØD

Fig. 4

1. 

Connect the flue outlet with the flue
system using a flue pipe with favour-
able flow characteristics.

2. 

Locate the test port (approx. 10 mm

7

) at a distance of two to three times

the diameter of the flue pipe down-
stream of the flue outlet.

3. 

Seal flue pipe.

4. 

Insulate the flue pipe.

Optional
Flue gas flange with mating flange.

Tab. 3 - Flue outlet D

*2

Boiler size

1

2

3

4

5

6

D

7

mm

700

800

850

950

1000

1100

Note

■ Prevent the return of condensate cre-

ated inside the flue system by suitable
on-site measures (condensate trap).

■ Close the condensate drain connec-

tors if they are not used. They are
designed to drain any condensate col-
lected in the start-up phase.

Note
Connect all flue pipes free of load and
torque stress. Flue pipe joints must be
gas-tight.

*2

Internal diameter, for external diameter: + 10 mm

 

Connecting the flue gas side

 (cont.)

5727 521 GB

Summary of Contents for VITOMAX 200-LW

Page 1: ...Installation instructions for contractors VIESMANN Vitomax 200 LW Type M64A Oil gas low pressure hot water boiler Heating output 8 0 to 20 0 MW VITOMAX 200 LW 5727 521 GB 1 2013...

Page 2: ...recommend the system is commissioned by Viessmann Industri eservice Regulations Observe the following when working on this system Statutory regulations regarding the prevention of accidents Statutory...

Page 3: ...mmended minimum clearances 6 Connecting the pipework 7 Fitting the measuring and control equipment 9 Preparing the control unit installation 9 Equipment for control and limitation 9 Connecting the flu...

Page 4: ...rve the following if the boiler is stored for 4 weeks Protect the interior of the boiler against moisture on the flue gas side and on the DHW side with a desiccant e g silica gel The amount of desicca...

Page 5: ...aged in the handling Observe all relevant accident prevention regulations Only use the marked fixing points F1 2 F1 2 9 0 4 5 Fig 1 1 Lifting the boiler Use lifting eyes A 7 80 mm or lift ing points C...

Page 6: ...and maintenance Level the boiler horizontally Observe risk warning in chapter Handling the boiler We recommend you position the boiler onto anti vibration boiler supports For this distribute sup ports...

Page 7: ...been completely dep ressurised Please note Unsuitable water quality can damage the boiler shell Only fill the boiler with water that meets the Water quality guide lines see service instructions Note...

Page 8: ...nector B Boiler flow connector C Safety valve connector D Fem connection for high limit safety cut out R E Fem connection for temper ature controller R F Fem connection for addition al control equipme...

Page 9: ...pment Power supply Connection and wiring diagrams supplied Preparing the control unit installation Vitotronic or Vitocontrol as an accessory Separate documentation Equipment for control and limitation...

Page 10: ...lange with mating flange Tab 3 Flue outlet D 2 Boiler size 1 2 3 4 5 6 D 7mm 700 800 850 950 1000 1100 Note Prevent the return of condensate cre ated inside the flue system by suitable on site measure...

Page 11: ...N 51603 part 1 Fuel oil S or SA to DIN 51603 part 3 5 When using fuel oil S or SA different output data heating output flue gas temperature efficiency may result Gas Natural gas and LPG in accordance...

Page 12: ...perture 2 Secure the burner to the burner plate with screws Note For different dimensions adjust the cut out in the thermal insulation according to the flame head diame ter 3 After mounting the burner...

Page 13: ...m flame head length Tab 4 Burner connection dimensions Boiler size 1 2 3 4 5 6 c 7mm 718 718 818 918 1018 1118 e mm 360 Note The type of flame tube depends on the pressure stage employed Product spe c...

Page 14: ...14 Service instructions of the boiler and separate documentation Commissioning and adjustment 5727 521 GB...

Page 15: ...15 5727 521 GB...

Page 16: ...ropshire TF1 7YP GB Telephone 44 1952 675000 Fax 44 1952 675040 E mail info uk viessmann com Viessmann Werke GmbH Co KG D 35107 Allendorf Telephone 49 6452 70 0 Fax 49 6452 70 2780 www viessmann com 5...

Reviews: