8
Procedure
Responsibility
Page
1
Install the Vitogate 300 and power supply unit.
Contractor
2
If not yet completed:
Install the LON communication module in the Vitotronic
control unit.
Contractor
See "LON communica-
tion module" installation
and service instruc-
tions.
3
Make the LON connection.
Contractor
4
Make the connection to the BACnet or Modbus.
Contractor
5
Power supply
Electrician
6
Connect the Vitotronic control unit to the LON.
Contractor
7
Start up the Vitogate 300.
IT expert/system inte-
grator
Installing the Vitogate 300
!
Please note
Ambient temperatures outside the fixed range
may impair data transfer and cause damage to
the device.
Maintain ambient temperatures of
–
25 to
+70 °C. Increased line losses occur at +55 °C or
above.
Connecting cables
Length
Standard delivery:
Connecting cable from Vitogate to power supply unit
0.4 m
Network cable (can be extended on site by IT expert)
2 m
Accessories:
LON cable
7 m
The LON connection can be extended with accessories; see "LON communica-
tion module" installation instructions.
Max. 900 m
Recommended power cable
3-core:
■
H05VV-F3G 1.5 mm
2
■
H05RN-F3G 1.5 mm
2
Vitogate 300 and its power supply unit are suitable for
installation on mounting rails (TS 35 to EN 50022:
35 x 15 and 35 x 7.5) inside control panels. Clip the
Vitogate 300 and its power supply unit into place on
the mounting rails.
Installation sequence
Sequence overview
5837535
Installation