Set-up
Set-up
8
Before Set-up
Before placing boiler in its installation
location, ensure all necessary
accessories (e.g. boiler stand) are
installed.
Do not use draft hood or boiler
enclosure paneling to lift/move boiler
into its installation location.
Installation Instructions
Boiler Stand
Minimum Clearances
Recommended minimum clearances for service
When the Divicon pre-assembled mixing
valve station is installed the minimum
distance beside the boiler must be
19¾” / 500 mm
There must be sufficient space for a
heating contractor to access the rear of
the boiler to inspect the blocked vent
switch.
5
1
6
7
4
6
3
v
1
.3
IMPORTANT
The boiler must be installed in such a
way that gas ignition system
components are protected from water
(spraying, splashing, etc.) during
boiler system operation and service.
CAUTION
m
in
.
2
5
0
m
m
min.
250 mm
min. 27½” / 700 mm
9
¾
”
9¾”
m
in
.
2
5
0
m
m
9
¾
”
Diagram is not to scale.
top min.
600 mm
24” /