
Before operating this boiler/burner unit, make sure you fully
understand its method of operation. Your heating contractor
should always perform the initial start-up and explain the
system and the need for regular inspection and maintenance.
The installation must conform to the requirements of the
authority having jurisdiction or, in the absence of such
requirements, to the National Fuel Gas Code, ANSI Z223.1
(latest edition). In Canada follow CAN/CSA–B149.1 or .2
Installation Codes (latest edition).
These instructions must be placed in an envelope and affixed
to the boiler.
Boiler handling
The boiler is shipped on a wooden pallet in a cardboard crate.
Crate and wooden pallet must be removed. Vent damper is
shipped separately.
Boiler location – Minimum clearances to combustibles
(all measurements from boiler enclosure)
Left side:
150 mm (6˝)
Right side:
25 mm (1˝)
Front:
150 mm (6˝)
Top:
450 mm (18˝)
Rear:
25 mm (1˝)
Floor:
Non-combustible
Flue:
150 mm (6˝).
Above clearances apply to all ECD boilers.
3
* With vent damper and intermittent pilot ignition
All sizes available with propane gas.
Electrical requirement
kW figures are approximate
For net IBR rating divide output by 1.15.
120V, 60Hz, less than 12A
Model
CSA input
DOE heating
Width
Vent
Gas
Water
Cast
Burners
Water
Weight
AFUE*
Steady
capacity
“A”
Conn.
Conn.
Conn.
Iron
Content
State
CGA output
“BØ”
Sections
Efficiency
ECD-65
65,000 Btu/h
53,950 Btu/h
350 mm
5˝
1
⁄
2
˝
1
1
⁄
4
˝
3
2
9.9 ltr
106 kg
83.7%
83%
19 kW
16 kW
14˝
2.6 USG
233lbs
ECD-80
80,000 Btu/h
66,400 Btu/h
350 mm
5˝
1
⁄
2
˝
1
1
⁄
4
˝
3
2
9.9 ltr
106 kg
83.5%
83%
23 kW
19 kW
14˝
2.6 USG
233 lbs
ECD-100 100,000 Btu/h
83,000 Btu/h
450 mm
6˝
1
⁄
2
˝
1
1
⁄
4
˝
4
3
13.2 ltr
130 kg
83.5%
83%
29 kW
24 kW
17
3
⁄
4
˝
3.5 USG
285 lbs
ECD-115 115,000 Btu/h
95,450 Btu/h
450 mm
6˝
1
⁄
2
˝
1
1
⁄
4
˝
4
3
13.2 ltr
130 kg
83.5%
83%
34 kW
28 kW
17
3
⁄
4
˝
3.5 USG
285 lbs
ECD-140 140,000 Btu/h
116,200 Btu/h
550 mm
7˝
1
⁄
2
˝
1
1
⁄
4
˝
5
4
16.5 ltr
157 kg
83.5%
83%
41 kW
34 kW
21
3
⁄
4
˝
4.3 USG
345 lbs
ECD-155 155,000 Btu/h
128,500 Btu/h
550 mm
7˝
1
⁄
2
˝
1
1
⁄
4
˝
5
4
16.5 ltr
157 kg
83.4%
83%
45 kW
38 kW
21
3
⁄
4
˝
4.3 USG
345 lbs
ECD-180 180,000 Btu/h
149,400 Btu/h
654 mm
7˝
1
⁄
2
˝
1
1
⁄
4
˝
6
5
26.8 ltr
192 kg
83.2%
83%
52 kW
44 kW
25
3
⁄
4
˝
7.1 USG
423 lbs
ECD-200 200,000 Btu/h
166,000 Btu/h
654 mm
7˝
1
⁄
2
˝
1
1
⁄
4
˝
6
5
26.8 ltr
192 kg
83.0%
83%
58 kW
48 kW
25
3
⁄
4
˝
7.1 USG
423 lbs
Vitogas 050, ECD Series Technical Data
Cut-away view
(left side)
Left view
Front view
A
Draft hood
Boiler well for
capillaries
Transformer
Ignition control
24V gas valve
Burner manifold
Vent
connection
Boiler supply
water 1
1
⁄
4
˝
(water flows out)
120V power in
120V 4A max.
output to pump
24V vent damper
Gas connection
Boiler return
water 1
1
⁄
4
˝
(water flows in)
24V thermostat
19.75˝ (502)
17.50˝ (445)
11.00˝ (279)
12.25
˝ (310)
26.00
˝ (660)
ECD-180/200 45.75
˝ (1160mm)
ECD-65 to 155 41.75
˝ (1060mm)
2.82˝ (72)
B
Boiler electrical requirements are 120V, 60 Hz, less than 12A
Max. pump amperage is 4A. Use field supplied relay for pumps over 4A.
2.5
˝ (64)