25
5797 344 - 01
Vitoflex 300-UF Installation & Operating
Item Boiler Model
UF 390
UF 530
UF 720
UF 950
UF 1250
no.
Description
Quantity
Quantity
Quantity
Quantity
Quantity
1
Pipe adaptor primary air 1
1
1
1
1
1
2
Pipe adaptor primary air 2
1
1
1
1
1
3
Elbow 130 x 0.9/90°
with PD
5
5
5
5
5
4
Flue damper blade
D=5
d
in. (130 mm)
4
4
4
4
4
5
Pipe 130 x 0.6
L=9
7/8
in. (250 mm)
2
--
1
--
--
6
Pipe 130 x 0.6
L=19
f
in. (500 mm)
1[1x L=8
7/8
in.
(225 mm)]
3[1x L=8
7/8
in.
(225 mm)]
1[1x L=9 in.
(228 mm)]
3[1x L=12
d
in.
(308 mm)],
1[1x L=16
d
in.
(409 mm)]
1[1x L=12
d
in.
(308 mm)]
7
Pipe 130 x 0.6
L=39
d
in. (1000 mm)
3[1x L=31
c
in.
(805 mm)],
1[1x L=36 in.
(914 mm)]
3[1x L=31
c
in.
(805 mm)],
1[1x L=32
f
in.
(830 mm)],
1[1x L=36 in.
(915 mm)]
5[1x L=18
d
in.
(460 mm)],
1[1x L=28
e
in.
(720 mm)],
1[1x L=33
a
in.
(845 mm)]
4[1x L=36 in.
(915 mm)]
5[1x L=36 in.
(915 mm)]
8
Clamping band 130
with gasket
18
18
18
19
20
9
Distributor
1
1
1
1
1
10
Fan DMVL
1
1
1
1
1
11
Intake cone
1
1
1
1
1
12
Recirculation bracket
1
1
1
1
1
13
Threaded rod M12
L=7
b
in. (190 mm)
2
1
2
2
2
14
Threaded rod M12
L=9
7/8
in. (250 mm)
--
1
--
--
--
15
Pipe clamp 125-130 M12
2
2
2
2
2
16
Fan bracket
1
1
1
1
1
17
Mesh 8 x 8
1
1
1
1
1
18
Pipe insulation
L=39
e
in (1000 mm)
4
5
5
6
6
19
Bolt M12 x 1 in. (25 mm)
4
4
4
4
4
20
Nut M12
4
4
4
4
4
21
Lock washer M12
8
8
8
8
8
22
Bolt M8 x 1 in. (25 mm)
6
6
6
6
6
23
Bolt M8 x
c
in. (20 mm)
8
8
8
8
8
24
Nut M8
6
6
6
6
6
25
Lock washer M8
14
14
14
14
14
26
Bolt M5 x
c
in. (20 mm)
4
4
8
8
8
27
Lock washer M5
4
4
8
8
8
x
Distance between the
recirculation fan and the
supply flange.
27
e
in. (695 mm) 27
e
in. (695 mm) 28
7/8
in. (735 mm) 33
a
in. (845 mm) 33
a
in. (845 mm)
y
Height of the horizontal
recirculation section.
41
b
in. (1055 mm) 51
a
in.(1303 mm) 49
b
in.(1258 mm) 51
d
in. (1299 mm) 71
7/8
in.(1825 mm)
Note:
Items 6 and 7 need to be lengthened by the customer.
Recirculation System
(continued)
Mechanical