15
Yes
Automatic calibra-
tion of the com-
bustion control
unit
No
Fault Eb
Check the con-
necting cable and
the ionisation elec-
trode,
check the flue gas
system (flue gas
recirculation)
For further details regarding faults, see
page 73.
Checking the static and supply pressure
Danger
CO build-up as a result of an incorrect burner setup can have serious health
implications.
Carry out a CO test prior to and after work on gas equipment.
Operation with LPG
Flush the LPG tank twice during commissioning/replacement. Thoroughly vent the
tank and gas supply lines after flushing.
Commissioning, inspection, maintenance
Further details regarding the individual steps
(cont.)