11
!
Please note
To prevent material damage, site the buffer cyl-
inder in a draught-free room free from the risk of
frost.
When not in use, the buffer cylinder must be
drained if there is a risk of frost.
■
Provide adequate clearance from the wall so that the
temperature controller can be operated (if installed).
■
Placing the heating water buffer cylinder on a plinth
will make the room easier to clean.
■
Use the adjustable feet to level the buffer cylinder.
Note
Never
extend the adjustable feet beyond a total length
of 35 mm.
Vitocell with immersion heater, type SVW
a
Fig. 7
Immersion heater installation instructions
Maintain the minimum clearance.
Note
The unheated length of any threaded immersion
heater installed on site must be at least 100 mm.
Vitocell
Capacity
Dim. a
Immersion heater output
Type SVW
200 l
min. 650 mm
6 kW
Vitocell 100-E/100-W, type SVW
!
Please note
The thermal insulation must not come into con-
tact with naked flames.
Exercise caution when welding and brazing.
1.
Install the cylinder temperature sensors; see page
23.
2.
At heating water flow temperatures above 95 °C,
remove the cover bezels from the pipe outlets
(bezels have l.h. threads).
3.
If no electric immersion heater is installed, seal the
front female connection with the plug supplied. Fit
the cover.
4.
Affix the type plate supplied to the back of the heat-
ing water buffer cylinder.
Installation sequence
Siting the Vitocell
5548 462 GB
Installation