5
3.
Feed cable H05V2V2-F through the cable fitting
and make the electrical connection.
The immersion heater EHE can be operated at 3
output stages.
The output is determined by the type of connection.
Make the mains connection for the immersion
heater EHE as 6 kW and 12 kW respectively, as
detailed in the tables below.
4.
Apply strain relief to the cable.
5.
Danger
An electrical fault causing serious injury may
result if the casing is not securely sealed.
Only use the washers, screws and casing
seal supplied. Never move or damage the
casing seal when closing the casing.
Close the casing.
Immersion heater EHE 6 kW
2 kW heating output connection:
4 kW heating output connection: 6 kW heating output connection:
1/N/PE 230 V~
1/N/PE 230 V~
3/PE 400 V~
STB
TR
L1 L2 L3
N
L1
N
PE
R S
U V W
T
B
C
A
D
Note
Remove jumper
D
when making this
connection.
STB
TR
L1 L2 L3
L1
N
PE
R S
U V W
T
B
C
A
D
N
STB
TR
L1
L2
L3
PE
R S
U V W
T
B
C
A
L1 L2 L3
D
Note
Remove jumper
D
when making
this connection.
A
On-site fuse/MCB, output-de-
pendent
B
3-pole switch (on-site)
C
Immersion heater EHE
D
Remove jumper (standard deliv-
ery)
A
On-site fuse/MCB, output-de-
pendent
B
3-pole switch (on-site)
C
Immersion heater EHE
D
Jumper (standard delivery)
A
On-site fuses/MCBs, output-de-
pendent
B
3-pole switch (on-site)
C
Immersion heater EHE
D
Remove jumper (standard deliv-
ery)
Installation sequence
Power supply
(cont.)
5686 109 GB
Installation