29
Electrical installation scheme
For a summary of electrical connections, see from page 53 and separate "Con-
nection and wiring diagram".
Primary circuit: brine/water, 2-stage
Type
BW 302.A090BW 302.A120BW 302.A150BW 302.A180
BW 302.A250
Hydraulic installation scheme
22
27
20
21
1
15
--2/211.1--
P1
25
--2/224.2--
P1
2
--KM BUS--
--230 V
--
--F2--
--21
1.1--
--F3--
--224.2--
--LP1 X3.8;3.9--
--2/LP1 X3.8;3.9--
P
Preparing for installation
Primary circuit: brine/water, 1-stage
(cont.)
5848 164 GB
Installation
Summary of Contents for BW 301.A090
Page 44: ...44 A Frame screw Installation sequence Siting the heat pump cont 5848 164 GB...
Page 157: ...157 5848 164 GB...
Page 158: ...158 5848 164 GB...
Page 159: ...159 5848 164 GB...