
17
2x
4x
4.
3.
5.
2.
1.
Fig. 10
Electrical connections
!
Please note
Electronic assemblies can be damaged by elec-
trostatic discharge.
Prior to commencing any work, touch earthed
objects such as heating or water pipes to dis-
charge static loads.
Installing the boiler
Opening the control unit enclosure
5789 302 GB
Installation
Summary of Contents for B2TB
Page 6: ...6 15 Keyword index 152 Index Index cont 5789 302 GB ...
Page 117: ...117 Parts lists Hydraulics 5789 302 GB Components ...
Page 154: ...154 5789 302 GB ...
Page 155: ...155 5789 302 GB ...