10
N
Condensate drain
O
Trap (can be fitted on either the right or left)
P
Plinth (accessories)
R
Oil line connection
S
Drain valve
T
Neutralising system (accessories), only to the right
or left of the boiler, or behind the boiler below the
heat exchanger
Preparing for installation
!
Please note
Avoid damaging the appliance.
Connect all pipework so that it is free of load
and torque stress.
1.
Prepare the water connections. Thoroughly flush
the heating system.
2.
Prepare the oil connections (oil filter).
■
Single line filter (magnum filter bowl with large fil-
ter element, filter grade max. 40
µ
m) with auto-
matic fuel oil air vent valve (see page 21).
■
Fit the filter as near as possible to the lower edge
of the left side panel to leave the flexible oil lines
long enough to enable removal of the burner.
3.
Prepare the electrical connections.
■
Power cable (sheathed cable):
NYM-J 3 x 1.5 mm
2
, max. fuse rating 16 A,
230 V/50 Hz
■
Accessory cables: NYM with required number of
cores for external connections
Removing the front panel
Fig. 3
Note
Remove the trap and packed components for the con-
trol unit from the front panel.
Preparing for installation
Preparing for installation
(cont.)
6136330
Installation