59
Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
•
1. Opening the heat pump
..................................................................................................... 60
•
2. Compiling reports
.............................................................................................................. 60
•
3. Purging the refrigerant lines and indoor unit
.................................................................. 60
•
4. Checking the refrigerant lines for leaks
........................................................................... 60
•
5. Evacuating the refrigerant lines and indoor unit
............................................................ 61
•
6. Charging the refrigerant lines and indoor unit
................................................................ 63
•
•
•
7. Checking the refrigerant circuit for leaks
........................................................................ 64
•
8. Filling and venting the secondary side
............................................................................ 64
•
9. Filling and venting the DHW cylinder on the DHW side
................................................. 66
•
•
•
10. Checking the expansion vessel and heating circuit pressure
•
•
•
11. Testing the anode connection
........................................................................................... 67
•
12. Measuring the anode earth current with an anode tester
.............................................. 67
•
13. Testing the protective magnesium anode
........................................................................ 68
•
14. Replacing the protective magnesium anode
................................................................... 68
•
15. Draining the appliance on the drinking water side
......................................................... 69
•
16. Cleaning the DHW cylinder
............................................................................................... 69
•
•
17. Checking the indoor unit electrical connections for firm seating
•
•
•
18. Checking that the fan in the outdoor unit can run freely
............................................... 70
•
19. Cleaning the outdoor unit heat exchanger (evaporator)
................................................ 71
•
20. Checking the thermal insulation of flared connections
•
•
21. Checking the outdoor unit electrical connections for firm seating
............................... 72
•
•
•
22. Closing the heat pump
....................................................................................................... 72
•
•
•
23. Switching on the power supply
........................................................................................ 72
•
•
•
24. Starting the heat pump
...................................................................................................... 73
•
25. Commissioning the system
............................................................................................... 73
•
•
•
26. Checking the heat pump for noise
................................................................................... 81
•
•
•
27. Checking the system function
.......................................................................................... 82
•
28. Instructing the system user
.............................................................................................. 82
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
51
17 700 GB