4
Installation
1.
Install new control (starting from
right side).
2.
Reconnect all wiring harnesses
(connectors are numbered which
correspond to the numbers printed
on the circuit board).
3.
Use two cable ties (field supplied) to
secure the harness to the control
base.
4.
Reinstall back cover (shield).