8
In a 1-phase power circuit
S
1 2 3 4 5 6
7 8 9 101112
13 14151617181920212223242526
N L1 L2 L3
L1
N
K
L
A
230 V~
B
C
D
K
L
Fig. 3
A
From the main electricity meter
B
To the RCD
C
Current sensor with 3 m connecting cable (energy
meter standard delivery)
D
Energy meter
Core assignment
1
Red
2
Black
Connect current sensors in the correct position, as
shown in fig. 3:
■
Green point facing in the direction of the RCD
■
Arrow of the "K
Ó
L" imprint (on the inside of current
sensor clip) pointing in the direction of the RCD
Electrical connections
Connecting the current sensors
5678 581 GB
Service