According to the applicable regulations, installation of the power pack in
the protected zones 0 and 1 of shower rooms and bathrooms is not per‐
„Regulations from section: Fields of application /
Mounting conditions“ on page 6
.
Viega recommends installing the power pack outside of the protected
zones 0–2.
3.2
Assembly
3.2.1
Inserting the magnet valve
Requirements:
n
The pre-wall element has been mounted.
n
The tiling work is completed.
n
The revision opening is freely accessible.
n
The urinal ceramic has been mounted.
Cut into the sticky tape of the shaft cover.
Remove the shaft cover.
Handling