
3.2.4
Set and clad the WC element
▶
Turn in the threaded rods by hand.
For 180 mm gauge for bore hole: Counter the threaded rods in front
of the element with a nut.
▶
Place the protective caps on the threaded rods.
▶
Corn a suitable gypsum cladding panel at the revision shaft and at
the site protection by applying gentle pressure.
▶
Cut out the recesses for the site protection, the revision shaft and
the threaded rods.
Handling
Prevista Dry WC element building project version
17