3.2
Assembly
Requirements:
n
The shower channel has been mounted according to the instructions
for use.
n
The complete surface of the shower channel has been lined.
n
The shower channel has been sealed, and the thin bed sealing is
fully cured.
n
The shower channel is equipped with a protective insert.
Apply the tile adhesive.
Mounting height 12 mm: Press the tile end rail down into the tile
adhesive as far as it will go.
Mounting height 15 mm: Set the tile end rail onto a tile adhesive bed
of a thickness of max. 3 mm.
12
15
Handling
Advantix shower channel mounting frame
8 from 9