Instructions for Use
Urinal flush plate for Prevista
Visign for Style 21
for urinal flushing systems
Model
Year built (from)
8611.2
03/2019
INT
Page 1: ...Instructions for Use Urinal flush plate for Prevista Visign for Style 21 for urinal flushing systems Model Year built from 8611 2 03 2019 INT...
Page 2: ...Maintenance 5 2 3 Product description 6 2 3 1 Overview 6 2 3 2 Technical data 6 3 Handling 7 3 1 Assembly information 7 3 1 1 Required material and tools 7 3 2 Assembly 7 3 2 1 Insert cartridge valve...
Page 3: ...d to possible operating instructions The installation of Viega products must take place in accordance with the general rules of engineering and the Viega instructions for use 1 2 Labelling of notes Wa...
Page 4: ...y e g DIN DVGW Some passages in the text may refer to technical codes in Europe Germany These should serve as recommendations in the absence of corresponding national regulations The relevant national...
Page 5: ...ulations applicable in Ger many Flush flow DIN 3265 Noise class DIN 4109 2 2 Intended use 2 2 1 Areas of use The urinal flush plate is intended for the actuation of flushes in urinals 2 2 2 Maintenanc...
Page 6: ...stallation frame 2 3 2 Technical data The product has the following technical data Minimum flow pressure 0 05 0 5 MPa 0 5 5 bar Flush flow see Regulations from section Technical data on page 5 0 3 0 7...
Page 7: ...ssembly 3 2 1 Insert cartridge valve Requirements n The pre wall element has been mounted n The tiling work is completed n The revision opening is freely accessible n The urinal ceramic has been mount...
Page 8: ...sion shaft outwards up to the tile level and snap them off Open the shut off with a screwdriver for a few seconds to rinse the pipeline Re close the shut off Remove the seal Grease the sealing element...
Page 9: ...ent is properly positioned Place the cartridge valve on straight and carefully screw in fine thread Tightening torque 5 Nm Screw in the cartridge valve size 27 Open the shut off valve Checking for lea...
Page 10: ...set flush volume Re set the flush volume if applicable 3 2 2 Mounting the flush plate Requirements n The cartridge valve is mounted and set Insert the actuator Observe proper alignment Apply the inst...
Page 11: ...ator Measure the actuator INFO The actuator must not protrude over the sleeve Take the installation frame and actuator off again Cut the actuator to length 9 9 NN 9 NN Handling Urinal flush plate for...
Page 12: ...sleeve over the actuator Secure the sleeve with a 90 clockwise turn Slide the retaining bolt in If necessary remove the retaining bolts again and cut the segments to length Slide the retaining bolt in...
Page 13: ...the retaining bolts by 90 in a clockwise direction To fix the retaining bolts turn safety rings in a clockwise direction Mount the flush plate The flush plate is mounted Handling Urinal flush plate f...
Page 14: ...ve dirty or dam aged Clean the cartridge valve if neces sary replace it Chapter 3 4 2 Cleaning car tridge valve on page 14 3 4 Care and maintenance 3 4 1 Care tips Use normal soap or a mild cleaning a...
Page 15: ...safety rings 90 anti clockwise Turn the retaining bolts 90 anti clockwise Turn the sleeve 90 clockwise to unlatch it Loosen the installation frame Handling Urinal flush plate for Prevista Visign for S...
Page 16: ...Re mount the cartridge valve and the flush plate in accordance with Chapter 3 2 1 Insert cartridge valve on page 7 3 5 Disposal Separate the product and packaging materials e g paper metal plastic or...
Page 17: ...Viega Technology GmbH Co KG service technik viega de viega com INT 2020 07 VPN200177...