![Viega 8522.31 Instructions For Use Manual Download Page 10](http://html1.mh-extra.com/html/viega/8522-31/8522-31_instructions-for-use-manual_1016593010.webp)
3 Handling
3.1
Assembly information
3.1.1
Mounting conditions
n
Masonry walls
n
Concreted walls
n
Metal support profiles
n
Prevista Dry Plus pre-wall constructions
The wall constructions must comply with the regulations in section
„Regulations from section: Fields of application / Mounting condi‐
.
The WC element may only be mounted on even wall surfaces.
With the construction height, the marked height of the upper edge of
the finished floor must be observed.
The WC element has an R
½
inch water connection.
The WC element can be extended by a remote flush actuation or by an
electronic actuation, as well as by sensitive flush plates. The cables for
these electrical actuation versions must be laid in front of the cladding.
The corresponding empty pipe is required when preparing the remote
flush actuation.
Suitable walls
Construction height
Water connection
Actuation versions
Handling
Prevista Dry WC element height-adjustable after installation by the installer
10 from 29