The container needs to be drilled at two points to enable the disposal of
the gas pressure spring without pressure and without oil. The drilling
points X1 and X2 vary depending on the diameter of piston rod and cyl-
inder.
Diameter (mm) piston rod / cylinder
X1 (mm)
X2 (mm)
8/19; 8/22; 10/22
20
30
8/28; 10/28; 14/28
40
35
10/40; 14/40
40
55
Open up gas pressure spring.
DANGER! Protect eyes, face and body and cover drill hole
before drilling.
Fig. 1: draining gas and oil
Using a 2–3 mm drill, drill slowly at point X1 until gas escapes.
ð
Due to the high internal pressure, metal fragments and oil can
squirt out.
Using a 2–3 mm drill, drill slowly at point X2 until pressure drops and
oil becomes accessible.
Pour out the oil into a suitable container.
Draining gas and oil
Handling
Viega Gas Pressure Spring
9 from 10