
Instruc
tion manual - English - EN
3
MNVKUEBP4_1920_EN
Use the screws and washers provided.
Put some thread-locker into the holes for
screws (Loctite 222®).
Pay attention to the fixing. Tightening
torque: 4.5Nm (±0.2Nm).
04
02
03
Fig.
2
Insert the O-ring supplied in the compartment
indicated in the figure (Fig. 3, page 3).
Fig.
3
6.2 Cables management
Connect the Ethernet cable supplied to the Ethernet
connector of the support.
Fig.
4
Insert all the cables in the cable glands of the base of
the PTZ unit.
Fig.
5
The Ethernet cable provided must not be cut. To
insert it in the M20 cable gland, remove the gasket.
Once the cables are inserted, tighten the cable
glands.