background image

 

 

 

IMV Indoor Motion Viewer - Install sheet Ed05EN 

2

/

5

 

Indoor Motion Viewer IMV

 

I N ST AL L AT I O N   D AT A   S H E ET

 

 

Programming / RF testing / Mounting 

 

The following provides summarized steps for device 
programming, testing and mounting. For complete details, 
refer to the control panel installation manual. 

1

1

 

 

Loosen bottom screw 

① (if present)

,  

separate base from IMV 

.

 

 

 

 

 

 

 

2

2

 

 

Install 2 SAFT LS14500 3.6V lithium batteries, observing 
correct polarity. 

 

 

 

 

 

 

Check that LED flashes before staying red. 

3

3

 

 

Put control panel into programming/configuration mode. 

4

4

 

 

Using a programmed alphanumeric keypad, proceed 
through menus until the display shows ADD A NEW 
DEVICE. 

5

5

 

 

Press 

Yes. 

The display shows PRESS PROGRAM BUTTON 

OF DEVICE. 

6

6

 

 

Press and release program button on IMV using  
your finger or a screw driver 

.  

The IMV LED flashes red 

.  

 

 

 

 

 

 

 

 
 
 
 
Wait for keypad display to show CAMERA (1 - 24) 
PROGRAMMED. 
 

 

7

7

 

 

Press 

Yes. 

The display shows RADIO RANGE TEST?  

Press 

Yes 

again. The IMV LED starts flashing and keypad 

display shows TEST IN PROGRESS. 

8

8

 

 

Move the IMV to the intended mounting location and 
make sure you receive a 5/5 or 9/9 indicating good 
communication with the control panel.

 

9

9

 

 

Press 

YES 

to end radio range test, then press 

Esc/No.

  

 

1

1

0

0

 

 

The display shows AREA ALLOCATION AREA: 1. Press 
either arrow button repeatedly until desired AREA 
number appears, then press 

Yes

. By default all devices in 

area 1 will be subject to the entry and exit delays. 

1

1

1

1

 

 

The display shows NAME + LOCATION.  
Enter appropriate device name (up to 16 characters). The 
name of the device should describe its intended 
mounting location or zone. Then press 

Yes. 

The display 

will show the device number and name for your 
verification. 

1

1

2

2

 

 

Mount the IMV on the wall: 

Follow the mounting rules on page 1 

Hold the IMV base against the mounting surface and 
mark the appropriate mounting holes.  

Drill pilot holes and install anchors where needed. 

Place base on mounting surface so that the pilot line 
up and secure base with appropriate screws. 

Attach camera to base and secure with screw if 
required. 
 

 

 

 
 
  
 
 
 
 
 

1

1

3

3

 

 

Press 

Yes. 

The display shows FUNCTIONAL DEVICE TEST? 

Press 

Yes 

again and verify IMV operation. For example, 

wave your hand in front of the sensor to activate the LED 
which indicates detection.  

1

1

4

4

 

 

Press 

Yes 

to end detection verification. 

1

1

5

5

 

 

The display shows ADD A NEW DEVICE? Repeat steps 1 – 
14 for remaining MotionViewers.  

1

1

6

6

 

 

When finished, exit from configuration mode by pressing 
and holding the ESC/NO for 5 seconds.. 

 
 
 

① 

② 

① 

② 

② 

① 

Summary of Contents for Indoor Motion Viewer

Page 1: ...ces in the following order Programming RF Testing program detector and all other devices into the control panel and test RF communication at each intended device location to the control panel Mounting mount detector at the tested location Mounting rules Use proper tools and hardware Mount indoors in a temperature controlled environment Mount camera 2 1 to 2 3 m 6 9 to 7 5 ft from the floor Respect...

Page 2: ...l panel 9 9 Press YES to end radio range test then press Esc No 1 10 0 The display shows AREA ALLOCATION AREA 1 Press either arrow button repeatedly until desired AREA number appears then press Yes By default all devices in area 1 will be subject to the entry and exit delays 1 11 1 The display shows NAME LOCATION Enter appropriate device name up to 16 characters The name of the device should descr...

Page 3: ...wer IMV INSTALLATION DATA SHEET Detection diagrams Technical data subject to change without notice 0 2m 4m 6m 8m 10m 12m 5m 4m 3m 2m 1m 0 1m 2m 3m 4m 5m PIR angle 90 Camera angle 110 Horizontal distance Floor level 0m 1m 4m 8m 12m Mounting at 2m10 Mounting at 2m30 1m00 ...

Page 4: ... radio frequency energy and if not installed and used in accordance with the instructions may cause harmful interference to radio communications However there is no guarantee that interference will not occur in a particular installation If this equipment does cause harmful interference to radio or television reception which can be determined by turning the equipment off and on the user is encourag...

Page 5: ...est Yes with LED indicator RF test Yes Installation Mounting Mounting height 2m10 to 2m30 6 9 to 7 5ft Mounting on wall On flat wall with 2x screws In corner with 2x screws Closing of the casing Closing by clip or with screw if required by local legislation Environmental and Physical properties Temperature 10 50 C 14 F 122 F Relative humidity 90 non condensed IP level IP30 IK04 Material ABS type U...

Reviews: