
900MHz TC-916 Rev-E 04-2007
2
SYSTEM SETUP
With so many technical variables in an installation, the strongest recommendation we can make is to conduct a bench test.
After verifying that all components of the system are in good working order and connected properly, we can arrive on the job
site confident that all of our devices will install with the least amount of on site effort.
1.
Physical Inspection of Product
A.
Compare the unit to the product photo on the attached specification sheet.
B.
Check for physical damage to the devices, contact your distributor or VideoComm
C.
Technical Support immediately should you suspect damage to the unit.
D.
Never operate the transmitter with out the antenna connected –
permanent damage will occur and void warranty
2.
Bench Testing Your 900MHz device
A.
Connect video source to transmitter video input
B.
Attach the included rubber duck antennas to the transmitter
C.
Connect power supply.
D.
Do not share power supplies with camera or other devices
Final setup should
look like this