(1) Measure the main frame of the range hood support
to the area planned for installation. Screw two 2”x4”
onto joists as shown (woodscrews not included).
Cut two 2”x4” (or 2”x6”) to the length of
the divide between joists.
(3) Thread the electrical outlet and duct through the
main frame of the range hood support
(2) Install an electrical outlet from the ceiling in
between the braces. Use 6”-Ø duct with elbow
connection for side vent.
(4) Screw the frame onto the drywall where the wood
braces are which will provide support.
Recommended to use this type of brace support when installing side wall vent system.
Duct protruding
from ceiling should
be 5” minimum in
length.
Use a shallow
electrical box
VICTORY range hoods
| PLANE ISLAND
16
VICTORY range hoods
PLANE ISLAND | 17
PRE-INSTALLATION (Side Vent - Floor above)