background image

CARE

 

AND MAINTENANCE

COMMITMENT TO QUALITY

1) AFTER CARE INSTRUCTIONS

2) MAINTENANCE

Regularly clean your shower product with warm soapy water

Clean the plastic parts with a cloth and mild detergent. Never
use any abrasive creams, dissolvents, acetone or detergents
and disinfectants that contain chlorine. The supplier accepts
no liability for any type of use of care other than those contained
in these instructions. The supplier reserves the right to introduce
technical changes without notice.

It is our intention that the quality and functions of this product
are of the highest standard. If you require help we advise you
firstly contact a competent plumber. However we understand that
this may not always be the case, so should you experience
any problems please contact out customer services quoting

the following:

Product name:

6mm One Door Quadrant 

Product code:

V6Q760 V6Q800 V6Q900

 

V6Q810 V6Q812 V6Q912

Customer help line number:0344 804 48 48

to prevent lime scale build up. Do not use abrasive cleaning
fluids or materials, or strong chemical cleaners as this will
damage the product surface.

9

Summary of Contents for V6Q760

Page 1: ...V01 07 2015 This product is universal not handed ASSEMBLY INSTRUCTIONS SIMPLICITY QUADRANT...

Page 2: ...on polishing and anodising processes in order to create your finished shower enclosure Some light surface marks are normal and is a result of the manufacturing processes Quality control has ensured th...

Page 3: ...lips 4 1xFixed Panels A 15 6xScrews 4x12 5 1xVertical seal A Fixed pane Al 16 1xFixed Panels B 7 1xHandle supplied separately 18 1xVertical seal B Fixed panel B 8 6xChrome Screw Cover Caps 19 1xMoving...

Page 4: ...help we advise you to contact a competent plumber THESE DIMENSIONS ASSUME THE WALLS ARE PLUMB AND THE SHOWER TRAY IS Installation Steps Step 1 LEVEL AND THAT THE WALLS ARE TILED DOWN TO THE TOP OF THE...

Page 5: ...Round Screw M4x30 MAKE SURE THE TRAY IS LEVEL USING A SPIRIT LEVEL BEFORE INSTALLING THIS SHOWER PANEL DOOR Step 2 4...

Page 6: ...1 3 Round Screw M4x10 Do not over tighten Round Screw M4x30 Step 3 2c 1c 1c 2c 4 2 5...

Page 7: ...Step 4 Step 5 Gently squeeze the frame into the other wall post 6...

Page 8: ...Step 6 Step 7 b1 Fixed panel A Fixed panel B Moving panel Fitting Water Deflectors Magnet Seals 7...

Page 9: ...h of the Quad into the glass Allow 24 hours for silicone to dry before use Silicone on the outside edge only Minimum 10mm internal overlap required Glass panel Glass panel Vertical profile Vertical pr...

Page 10: ...introduce technical changes without notice It is our intention that the quality and functions of this product are of the highest standard If you require help we advise you firstly contact a competent...

Page 11: ...INSTALLERS NOTES 10...

Page 12: ...onmentally friendly way We suggest you take it to the local landfill site and discard in the designated bins Shower enclosures with aluminium profiles and safety glass Victoria Plum Limited Bridgehead...

Reviews: