Contents
1 Safety Precautions ................................................................ 1
2 Outline of the Unit and Main Parts ........................................ 2
3 Preparative for Installation .................................................... 3
...................................................
3.2 Selection of the Installation Location
.....................................
3.3 Connection Pipe Requirement
.............................................
........................................................
4 Installation of the Unit............................................................ 7
4.1 Installation of the Indoor Unit ................................................... 7
4.2 Installation of the Outdoor Unit .............................................. 11
4.3 Installation of the Connection Pipe ........................................ 12
4.4 Vacuum and Gas Leakage Inspection ................................... 16
4.5 Installation of the Drain Hose ................................................ 18
4.6 Installation of the Duct ........................................................... 22
4.7 Electrical Wiring .................................................................... 24
5 Installation of Controllers ..................................................... 29
6 Test Running ....................................................................... 29
6.1 Trial Operation and Testing
................................................
..............................................
7 Unit Function ....................................................................... 32
7.1 Setting of Double Indoor Room Sensors
..............................
7.2 Checking of Outdoor Ambient Temperature
...............................................................
8 Troubleshooting and Maintenance ...................................... 33
.................................................................