2
Table of Contents:
Please refer to the installation manuals of the zoning system controllers for all required information
related to wiring, installation, commissioning and integration:
•
For detailed information on the Viconics VZ72xx zone controller, please refer and read the VZ72xx product
guide. Installation and commissioning information is available on document:
LIT-VZ7260X-Exx
•
For detailed information on the Viconics VZ76xx RTU controller, please refer and read the VZ76xx product
guide. Installation and commissioning information is available on document:
LIT-VZ7656X-Exx
•
Information on 3
rd
party BACnet integration, is available on document
ITG-VZ7xxx-BAC-Rel2-Exx
1. System Overview and Architecture
A. Initial design criteria considerations
B. Scalability and limitations
C. Local Zone with Terminal Reheat or Without Terminal Reheat
D. Atypical zone areas
E. By-pass damper design rules
F. Indoor Air Quality Control Standards
2. Zone controllers VZ7260X5x00B operation and strategy
A. Demand based heating and cooling system
B. Overrides and user zone interface lockouts
C. Zone set point limits
D. Heating and cooling weight zone selection
E. Minimum, maximum and max heat flow adjustments
F. Terminal reheat lockout
G. Passive infra red motion detector cover (PIR)
H. AI4 CO2 / Other Sensor Input Operation
I. Disable Minimum Position parameter
J. Heating and Cooling Performances
3. RTU controllers VZ7656X1000B operation and strategy
A. Operation data exchanged
B. Occupancy and overrides
C. RTU interface lockouts
D. RTU heating and cooling supply air temperature lockouts
E. RTU heating and cooling outdoor air temperature lockouts
F. Critical
mid-season changeover
G. By-pass damper / VFD control and operation
H. Minimum Supply Heat Temperature Control and Lockout
I. Indoor Air Quality Control & Operation
4. BACnet Communication system overview
A. 3
rd
party BACnet integration
B. Communication wiring and layout
C. Communication status LED and troubleshooting
5. System commissioning
A. Proper commissioning zone controllers
B. Proper commissioning RTU controllers
C. Operational system checklist
6. Things you need to know
A. Single 24 VAC zone transformer vs. multi 24 VAC zone transformers
B. Critical point checks
C. Balancing and capacity