![Vicon VM614RK-2 Installation & Operation Manual Download Page 9](http://html1.mh-extra.com/html/vicon/vm614rk-2/vm614rk-2_installation-and-operation-manual_1012988009.webp)
XX068-10-00 Rev 1100 VM614RK-2
Installation
••
3
Installation
Unpacking and Inspection
All Vicon equipment is tested and inspected before leaving the factory. It is the carrier’s responsibility to deliver
the equipment in the same condition as it left the factory.
Inspection For Visible Damage
Immediately inspect the cartons upon delivery. Make a note of any visible damage on all copies of the carrier’s
freight bill.
Make sure the carrier’s agent (the person making the delivery) signs the note on all copies of the bill. If the agent
does not have claim forms, contact the carrier’s office.
Inspection For Concealed Damage
As soon as possible after delivery, unpack the unit and inspect it for concealed damage. Do not discard the
carton or packing materials. If the unit is damaged, contact the carrier immediately and request forms for filing a
damage claim. Make arrangements for a representative of the carrier to inspect the damaged equipment.
If the equipment must be returned for repair, follow the Shipping Instructions at the end of this manual.
Kit Contents
Prior to starting assembly, become familiar with the components in the mounting kit. Refer to Figure 1. The
rack-mounting kit includes the following parts:
Baseplate
Extension plate
Brackets
Left side support bracket (gusset)
Right side support bracket (gusset)
Front panel (bezel)
Additionally, the accessory kit supplied contains a variety of screws and hardware required for assembling the
rack mount. Refer to Table 1. In addition to these screws, six screws of a type suitable to attach the monitor
mount to the EIA rack are required. These are commonly No. 10-32 screws, but individual rack manufacturers
may use other types.