11
5
Delivery and assembly
5.1
Delivery and accessories content
The boiler is supplied according to a purchase order so that a boiler drum and boiler cladding are placed on a pallet. The lining of the
combustion chamber is packed separately. Accessories is placed inside the boiler drum, and is available after opening the stocking door. The
boiler is packed in transport package and it is not allowed to tip it during transportation.
Standard content of the boiler supply:
boiler on a pallet
-
heating water flange with a thread
2 pcs
-
sealing
90 x 60 x 3
2 pcs
-
washer 10,5
8 pcs
-
nut M10
8 pcs
-
complete draught regulator
1 pc
-
plug Js 6/4“ blind
1 pc
-
sealing
60 x 48 x 2
1 pc
-
capillary spring
1 pc
-
bakelite ball
1 pc
-
eye screw
1 pc
-
screw M5x30
1 pc
-
nut M5
1 pcs
-
washer 5,3
1 pcs
assembly of combustion chamber lining 1 pc
inclined grate depending the boiler size
1 pc
cladding including ash-pan and insulation
-
lowered bracket
2 pcs
-
washer 10,5
4 pcs
-
nut M10
4 pcs
-
screw 4,8 x 13
8 pcs
-
thermo-manometer
1 pc
-
inclined bushing
1 pc
cleaning tools
-
hook
1 pc
-
brush
1 pc
-
extending stick
1 pc
commercial and technical documentation (boiler type plate, energy label, instructions)
Additional accessories (it is not a part of supply):
Cast-iron pedestal for the type 16 boiler (ordering code 17 659)
Cast-iron pedestal for the type 21, 25 boiler (ordering code 17 751)
Cast-iron pedestal for the type 30 boiler (ordering code 17 569)
Turbulators depending on the boiler size
Necessary accessories (it is not a part of supply):
Final-cooling loop (1 pc), including a flange, or two-way safety valve DBV 1 - 02, including siseal (10 g). This equipment doesn't need to be
used in the case of an opened heating system.
Thermostatic valve TS 130 (STS 20)
– TV 95°C – can be bought in supermarkets (only in case of delivery with the final-cooling loop)
Safety valve 1 pc
Accessories delivered by user's request (it is not a part of supply):
Filter 3/4“ (for the boiler with a two-way safety valve DBV 1 – 02)
Filling and discharge cock
Boiler equipment ordered as "additional accessories, necessary accessories and accessories delivered by user's request" in not
included into the basic price of the boiler.
5.2
Mounting procedure
5.2.1
Boiler drum installation
5.2.1.1
Boiler drum installation - final-cooling loop
1.
Install the boiler drum on the pedestal or bedding (pad).
2.
Weld the flange heating water of the final-cooling loop to the weldment of the final-cooling loop (depending on the boiler-room layout);
insert a sealing Ø 90 x 60 x 3 between the flange and boiler; afterwards mount the weldment with help of 4 pcs of the nuts M 10 and 4 pcs
washers 10,5 to the boiler. Interconnect the upper output of heating water by a weld-joint with to the heating system.
3.
Interconnect the bottom output from the final-
cooling loop by means of welding of 1 1/2“ tube with the return water output (return water
flange) to the boiler.
4.
Mount a thermostatic valve on one of the outputs of the final-
cooling loop (mount the sensor into the well and connect the 1/2“ cold water
input). Beware of water flow direction marking with help of an arrow; it must be equal with the one according to Fig. No. 5.
5.
Interconnect the second
1/2“ output of the final-cooling loop with the sewage (warning: in order to check function of the thermostatic valve,
we recommend that you interconnect the water discharge with the waste pipe with help of a hopper).
6.
After having connected the boiler to the heating system, screw the discharge valve to the boiler according to Fig. No. 13.
7.
Put the chimney pipe on the chimney pot and insert it into the chimney hole. The chimney pipe diameter is 160 mm.
8.
Screw the draught regulator into the hole in the upper part of the front section. The procedure of setting of the boiler draught regulator is
specified in the manual which is attached in the corresponding regulator
9.
Blind the hole with a JS 6/4“ thread in the front section with a JS 6/4“ plug. Place a sealing of Ø 60 x 48 x 2 under the plug.
10.
It is recommend that you use shut-off valves for the heating water input and output, because in case these valves are not used, while
cleaning the filter it would be necessary to clean the whole system.
Summary of Contents for U22 Economy 16
Page 32: ...32 16 Information specified on the name plate ...
Page 34: ...34 ...
Page 37: ...37 ...
Page 38: ...38 ...
Page 39: ......