10
5
Delivery and installation
5.1
Delivery and accessories
The boiler is supplied according to the order so that the complete boiler drum is placed on the palette. The boiler shell is packed separately.
Accessories are stored inside the boiler drum, accessible by opening the stoking door. The boiler is packed in a shipping container and must not
be tilted during transport.
Standard boiler delivery:
•
Boiler on the palette
-
heating water flange with thread
2 pc
-
return water flange with a distribution pipe
1 pc - only for 7 sect. version
-
sealing
φ
90 x 60 x 3
2 pc
-
washer 10.5
8 pc
-
nut M10
8 pc
-
fill and drain tap Js 1/2“
1 pc
-
complete draught regulator
1 pc
-
blind plug Js 6/4“
1 pc
-
sealing
φ
60 x 48 x 2
1 pc
-
capillary spring
1 pc
-
wave spring
1 pc
•
lining of the combustion changer
-
lower ceramic liner (box 4)
1 pc
-
middle ceramic liner - rear part (box 3)
1 pc
-
middle ceramic liner - front part (box 5)
1 pc
-
upper ceramic liner (box 6)
1 pc
-
tertiary air inlet nozzle (box 2)
1 pc
•
pin for the upper lining or Allen wrench 4
1 pc
•
inclined grate
1 pc
•
shell including insulation and ash-pan
-
reduced bracket
2 pc
-
washer 10.5
4 pc
-
nut M10
4 pc
-
spring clamp
4 pc
-
screw M5 x 12
10 pc
-
connecting pin
4 pc
-
thermomanometer
1 pc
-
screw M8 x 12
4 pc
•
cleaning tools
-
hook
1 pc
-
brush with handle
1pc
-
spike
1 pc
-
cleaning tool holder
1pc
•
handling key
1pc
•
refractory adhesive 50 ml to back the nozzle
1pc
•
sales and technical documentation
Additional equipment (not included into the delivery):
•
Cast iron boiler basement 5 sections (ord. code 17659)
•
Cast iron boiler basement 6 sections (ord. code 17751)
•
Cast iron boiler basement 7 sections (ord. code 18569)
Necessary accessories (not included into the delivery):
•
After-cooling loop (1 pc) inlc. the flange of the two-way safety valve DBV 1 - 02 incl. siseal (10 g).
This equipment may not be used in case of open heating system.
•
Thermostatic valve TS 130 (STS 20) – TV 95°C – can be bought in warehouses (only in case of delivery with the after-cooling loop)
•
Safety valve
1 pc
At the customer's request (not included into the delivery):
•
Filter 3/4“ (for the boiler with the two-way safety valve DBV 1 - 02)
The boiler equipment ordered as "additional equipment, necessary accessories and at the customer's request" is not included in the
basic price of the boiler.
5.2
Installation procedure
5.2.1
Installation of boiler drum
5.2.1.1
Installation of boiler drum – after-cooling loop
1.
Set the boiler drum on the basement or substructure.
2.
Pre-weld the heating water flange of the after-cooling loop on the after-cooling loop weldment (according to the boiler room dispositions),
insert the seating Ø 90 x 60 x 3 between the flange and the boiler, then mount the weldment by means of 4 nuts M 10 and 4 washers 10.5
to the boiler. Connect the upper heating water outlet and the heating system by welding.
3.
Connect the lower outlet from the after-cooling loop to the boiler by welding the 1 1/2“ pipe to the outlet of the return water (return water
flange).