1
2
4
3
50
51
07/2018
VETRON 5390 - POST BED MACHINE - INSTRUCTION BOOK
07/2018
VETRON 5390 - POST BED MACHINE - INSTRUCTION BOOK
05. PROGRAMMING
05.
CREATE PROGRAMCHAIN
-2-4
DISPLAY
STEP
DESCRIPTION
»
CREATE PROGRAMCHAIN
6
Seam 1
Seam 2
Stitch count
PEDAL -2
Program Key
Electronic handwheel
7
►
Turn the
JOG KEY
(
10
)
to store.
8
I S
E
D
M
N
S
I
A
E
S
i
a
u
o
t
e
t
m
a
n
s
i
You can enter the postion in the seam
for the switch over here.
9
You can choose between the following type of switch over:
In the seam
= Switch will occure before backtack and thread trimming e.g. if you want to join two pieces with a
chain on a program with start and end backtack it will switch to the next sequence before the end
backtack (picture 1). Backtack and thread trimming will be deactivated. The next sequence starts
after the start backtack (picture 2). The start backtack is deactivated.
Seam end
= The switch will take place (if part of the program) after the end backtack and thread trimming (picture 3).
The next seam starts with a backtack (picture 4) (if part of the program).
Picture 1
Picture 3
Picture 2
Picture 4