Vestil P-JIB Instruction Manual Download Page 1

Table of Contents

 

Rev. 8/4/2020 

P-JIB MANUAL 

Table of Contents

 

Copyright 2020 Vestil Manufacturing Co. 

Page 

1

 of 

14

 

 

                               

 

 

               

 

 

 

 

P-JIB Portable Jib Crane 

Instruction Manual 

 

 

 

Receiving Instructions  

  After delivery,  remove the packaging from the product. Inspect the product closely to determine whether it 

sustained damage during transport. If damage is discovered, record a complete description of it on the bill of lading. 

If the product is undamaged, discard the packaging.

 

 

NOTE:

 

The end-user is solely responsible for confirming that product design, use, and maintenance comply with 

laws, regulations, codes, and mandatory standards applied where the product is used.

 

 

Technical Service & Replacement Parts  

  For answers to questions not addressed in these instructions and to order replacement parts, labels, and 

accessories, call our Technical Service and Parts Department at (260) 665-7586. The Department can also be 

contacted online at 

http://www.vestilmfg.com/parts_info.htm

.

 

 

Electronic Copies of Instruction Manuals 

  Additional copies of this instruction manual may be downloaded from 

https://www.vestil.com/page-manuals.php

. 

 

 

Vestil Manufacturing Corp. 

2999 North Wayne Street, P.O. Box 507, Angola, IN 46703 

Telephone: (260) 665-7586  -or-  Toll Free (800) 348-0868 

Fax: (260) 665-1339 

Web: 

www.vestilmfg.com

     e-mail: 

[email protected]

 

 

 

 

Table of Contents 

Page 

Signal Words

….…………………………………………………………………………………….……….…….….... 

  

2

 

Safety Instructions

……….………………………………………………………………………………………..…..... 

 

2

 

FIG. 1A: P-JIB-2 Exploded View & Bill of Materials

……………….………………………………………………. 

 

3

4

 

FIG. 1B: P-JIB-2 Specifications

……………………………….…….……………………………………………….. 

 

5

 

FIG. 2A: P-JIB-4 Exploded View & Bill of Materials

……………...……………………………………………….. 

 

6

7

 

FIG. 2B: P-JIB-4 Specifications

……………………………..…..……………………………............................. 

 

8

 

FIG. 3: Manual Hydraulic Pump Exploded View & Bill of Materials

…………………………………………….. 

 

9

 

Using the Crane

……………………………................................................................................…………… 

 

10

 

Using the Hand Pump

………………..…………………………………………………………….…………………. 

 

10

 

Air Purging Procedure

…………………………………………………………………………..…………….…… 

 

11

 

Boom Length Adjustment

………………………………………………………………………………..……….…… 

 11

 

Record of Satisfactory Condition

................................................................................................................... 

 

11

 

Inspections & Maintenance

…………………………..………………………………………….......................… 

11

-

12

 

Troubleshooting

………………………………………………………………………………………………………….. 

12

 

Labeling Diagram

……...……………………………….……………………………………………………………….. 

 

 

13

 

Limited Warranty

…...…………………………………………………………………………………………………… 

 

14

 

 

Summary of Contents for P-JIB

Page 1: ...call our Technical Service and Parts Department at 260 665 7586 The Department can also be contacted online at http www vestilmfg com parts_info htm Electronic Copies of Instruction Manuals Additional...

Page 2: ...he load Avoid contact with the casters Stand clear of the load while raising and lowering it ONLY use the crane on even level improved surfaces concrete or asphalt capable of supporting the combined w...

Page 3: ...Table of Contents Rev 8 4 2020 P JIB MANUAL Table of Contents Copyright 2020 Vestil Manufacturing Co Page 3 of 14 FIG 1A P JIB 2 EXPLODED VIEW 28 006 268 BILL OF MATERIALS ON FOLLOWING PAGE...

Page 4: ...finish 3 8 16 2 1 19 65076 1 8 x1 cotter pin zinc plated 4 1 20 99 112 006 Pin clevis 4 1 21 45286 11 hitch pin clip 1 8 x2 5 8 3 1 22 65127 Cotter pin zinc plated 3 16 2 4 1 23 11007 Hex bolt 1 4 20...

Page 5: ...be adjusted in 7in increments Boom length determines the maximum rated load of the crane which decreases as boom length increases as indicated in the table below NOTE Ballast is ALWAYS required whenev...

Page 6: ...Table of Contents Rev 8 4 2020 P JIB MANUAL Table of Contents Copyright 2020 Vestil Manufacturing Co Page 6 of 14 FIG 2A P JIB 4 Exploded View Bill of Materials...

Page 7: ...Nylon insert lock nut grade 2 zinc finish 3 8 16 18 1 19 45286 11 hitch pin clip 1 8 x 2 5 8 1 1 20 65127 Cotter pin zinc plated 3 16 2 4 1 21 11007 Hex bolt 1 4 20UNC x1 1 4 12 1 22 37018 Nylock nut...

Page 8: ...m length to be adjusted in 7in increments Boom length determines the maximum rated load of the crane which decreases as boom length increases as indicated in the table below Ballast box NOTE Ballast i...

Page 9: ...G 4 1 4 99 146 006 SPRING COMPRESSION RETAINER 2 1 17 93257 SHCS 5 16 18 x 1 1 4 4 1 5 99 110 006 BEARING BALL 3 8 2 1 18 129169 LOCK WASHER HI COLLAR ZINC PLATED 4 1 6 99 146 005 SPRING COMPRESSION O...

Page 10: ...until the hook is centered above the load NOTE Add the weight of all rigging to the weight of the load to calculate the net weight applied to the crane The net weight must be less than or equal to the...

Page 11: ...examine the load hook and shackle Make sure that neither is severely worn warped bending or cracking Confirm that the safety latch of the hook operates correctly Also inspect the shackle bracket The b...

Page 12: ...draulic hose d Relief valve pressure setting too low a Remove enough of load that weight of load is within capacity b Add oil until level is within one inch of top of reservoir c Correct as appropriat...

Page 13: ...om parts_info htm or by calling 260 665 7586 and asking for the PARTS DEPARTMENT LABELING DIAGRAM E Label 287 on counterweight model serial number capacity D Label 586 on counterweight use related war...

Page 14: ...lic pumps motor controllers and cylinders It also covers defects in original parts that wear under normal usage conditions wearing parts such as bearings hoses wheels seals brushes and batteries How l...

Reviews: