![Vestil MEZZ-200-DW Manual Download Page 8](http://html1.mh-extra.com/html/vestil/mezz-200-dw/mezz-200-dw_manual_1009729008.webp)
Rev. 9/28/2020
MEZZ-KD MANUAL
Copyright 2020 Vestil Manufacturing Co. Page 8 of 10
Select a location for the mezzanine gate system that is close to the edge of the upper level. Move the assembly
into position and anchor it to the surface by installing
3
/
8
” flat washers and anchor bolts through the 4 bolt holes in
each post mounting bracket. The length of the anchor bolts should be determined by a qualified and trained
individual such as your building engineer.
Top gate
Bottom gate
Side
gate
Upper level
Lower level
Post mounting bracket
3
/
8
”
anchor
bolt
Post mounting
bracket
INSTALLING THE GATE SYSTEM