background image

Table of Contents

 

Rev. 9/28/2020    

MEZZ-KD MANUAL 

Table of Contents

 

Copyright 2020 Vestil Manufacturing Co.                                                               Page 1 of 10 

 

 

 

 

 

                       

 

 

                 

 

 

MEZZ-KD-88T-93D and MEZZ-KD-88T-93D-A 

Knock-Down Mezzanine Gate Systems 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Receiving Instructions

 

After  delivery,  remove  the  packaging  from  the  product.  Inspect  the  product  closely  to  determine 

whether it sustained damage during transport. If damage is discovered, record a complete description of 

it on the bill of lading. If the product is undamaged, discard the packaging. 

NOTE: 

The  end-user  is  solely  responsible  for  confirming  that  product  design,  use,  and  maintenance 

comply with laws, regulations, codes, and mandatory standards applied where the product is used. 

Technical Service & Replacement Parts

 

For answers to questions not addressed in these instructions and to order replacement parts, labels, 

and  accessories,  call  our  Technical  Service  and  Parts  Department  at  (260)  665-7586.  The  department 

can also be contacted online at 

http://www.vestilmfg.com/parts_info.htm

. 

Electronic copies of Instruction Manuals

 

 

Additional  copies  of  this  instruction  manual  may  be  downloaded  from 

https://www.vestil.com/page-

manuals.php

.

 

 

 

Vestil Manufacturing Corp. 

2999 North Wayne Street, P.O. Box 507, Angola, IN 46703 

Telephone: (260) 665-7586 -or-  Toll Free (800) 348-0868 

Fax: (260) 665-1339 

Web: 

www.vestilmfg.com

 

   e-mail: 

[email protected]

 

 

 

Table of Contents

 

Page 

Signal Words

……………………………………………………………….…………………………..…… 

2

 

Safety Instructions

………….………..………………………………………………………….….......….. 

2

 

Specifications

………….…………………………………………………….……………………...……..... 

3

 

Exploded Views and Bills of Materials

....................................................................................... 

4

5

 

Assembling the Gate System

……...……………………………………….……………………………… 

6

 - 

7

 

Installing the Gate System

………………………………………………………………………………….

 

8

 

Using the Gate System

……………….…………………….……………….………………..……………. 

9

 

Record of Satisfactory Condition

………………………………………………………………………….. 

9

 

Inspecting and Maintaining the System

………………………………………………………….………. 

9

 

Labeling Diagram

.…………..………..……………………………………………................................... 

9

 

Limited Warranty

……………………………………..……………………………………………………... 

10

 

 

 

NOTE: 2”x4”Lumber shown in 

 

photo not included. 

Summary of Contents for MEZZ-200-DW

Page 1: ...ot addressed in these instructions and to order replacement parts labels and accessories call our Technical Service and Parts Department at 260 665 7586 The department can also be contacted online at http www vestilmfg com parts_info htm Electronic copies of Instruction Manuals Additional copies of this instruction manual may be downloaded from https www vestil com page manuals php Vestil Manufact...

Page 2: ...stalling using or servicing this gate system Keep a copy of this manual in an accessible location known to all persons who use the gate system Additional copies of this instruction manual may be downloaded from https www vestil com page manuals php Keep the bottom gate down at all times except when placing or removing materials inside the gate DO NOT modify the product in any way without first obt...

Page 3: ...d box A PDF file will open This file is the specifications document Print a copy of the document and keep it with your copy of this manual The following diagrams are exemplar specifications documents for models MEZZ KD 88T 93D and MEZZ KD 88T 99D A NOTE USABLE LOAD SIZE IS DEPENDENT UPON THE LOAD HEIGHT AND LOAD DEPTH AS WELL AS THE PLACEMENT OF THE LOAD WITHIN THE GATE TALLER LOADS MUST BE SHORTE...

Page 4: ...2 23 014 419 FRAME SUPPORT BAR 2 3 23 016 225 BRACKET ROTATION SUPPORT 4 4 23 014 420 FRAME FORMED GATE FRAME 8 5 23 131 016 GUSSET ENDS 4 6 23 131 017 GUSSET CENTER 2 7 23 016 224 BRACKET RAIL SUPPORTS 12 8 23 113 013 SPACER 2 9 21355 Ø3 8 16 x 1 Zinc Finish Grade A Round Head Carriage Bolt 36 10 26358 3 8 16 SHSB 1 2 X 3 SHOULDER 2 11 21363 CARRIAGE BOLT Z PLATED 3 8 16 UNC x 2 1 2 30 12 37024 N...

Page 5: ...14 217 WELDMENT FRAME SIDE GATE 2 2 23 014 451 FRAME SUPPORT BAR BRACE 2 3 23 016 230 BRACKET ROTATION SUPPORT 4 4 23 014 452 FRAME FORMED GATE FRAME 8 5 23 131 020 GUSSET ENDS 4 6 23 131 021 GUSSET CENTER 2 7 23 016 231 BRACKET RAIL SUPPORTS 12 8 23 113 016 SPACER 2 9 21355 Ø3 8 16 x 1 Zinc Finish Grade A Round Head Carriage Bolt 36 10 26358 3 8 16 SHSB 1 2 X 3 SHOULDER 2 11 21363 CARRIAGE BOLT Z...

Page 6: ...ts of carriage bolts 11 and lock nuts 12 Use a 7 16 drill to make bolt holes in the planks Step 1 Install the side gates 1 As shown in the diagram determine the necessary clear width of the aisle measured between inside edges of mounting brackets Secure the gates to the surface with 3 8in flat washers and anchor bolts of appropriate length as determined by your building engineer Orient the gates s...

Page 7: ...the bolt hole in the handrail the two lower bolts insert on either side of the gate post 3 11 Handrail Gate post Upper bolt Lower bolt Step 5 Install shoulder bolts 10 and spacers 8 through the remaining bolt holes in the support brackets 3 Handrail Spacer Step 6 Connect the pivoting assembly completed in step 3 to the shoulder bolts 10 and installed in step 5 Apply lock nuts 12 to the ends of the...

Page 8: ...e assembly into position and anchor it to the surface by installing 3 8 flat washers and anchor bolts through the 4 bolt holes in each post mounting bracket The length of the anchor bolts should be determined by a qualified and trained individual such as your building engineer Top gate Bottom gate Side gate Upper level Lower level Post mounting bracket 3 8 anchor bolt Post mounting bracket INSTALL...

Page 9: ...ut the condition of your gate system contact the TECHNICAL SERVICE department see cover page of this manual Never make temporary repairs of damaged or missing parts Only use manufacturer approved replacement parts Inspect the following components at least once per month 1 Gates inspect each gate for damage such as bends breaks corrosion and damage caused by impacts with vehicles or other objects C...

Page 10: ...aulic pumps motor controllers and cylinders It also covers defects in original parts that wear under normal usage conditions wearing parts such as bearings hoses wheels seals brushes and batteries How long is the warranty period The warranty period for original dynamic components is 90 days For wearing parts the warranty period is 90 days Both warranty periods begin on the date Vestil ships the pr...

Reviews: