![Vertiv NetSure V200D50 Installation And User Manual Download Page 23](http://html1.mh-extra.com/html/vertiv/netsure-v200d50/netsure-v200d50_installation-and-user-manual_1008119023.webp)
Vertiv
|
NetSure V200D50 DC Power Retrofit Installation & User Manual (UM486527803)
|
Rev. F
23
Figure 11:
Rectifier Handle and Safety Latch
4.
Push the handle into the front panel of the Rectifier. This will lock the Rectifier securely to the frame.
5.
Repeat Step 1 through 4 for each of the remaining Rectifiers.
6.
After the Rectifiers are physically installed in the Mounting Frame, they are ready for operation
immediately after power is supplied to them.
7.
On the Power System controller (MCA), update the system inventory as necessary. Refer to the Power
System documentation for a procedure.
NOTE!
The MCA identifies the entire Retrofit Assembly as one PCU.
8.
Ensure that there are no local or remote alarms active on the system.
9.
Install the front cover on the Mounting Frame. Secure by tightening the two captive fasteners. Refer to
Figure 12:
Securing Front Cover Panel
Mounting Frame
Front Cover Panel
(3) R48-3500
Rectifiers
Installed
Captive Fasteners