Vertiv™ NetSure™ ITS 12V DC Power Shelf Installation & User Manual
9
5.5
External Alarm, Reference, Monitoring, and Control Connections
5.5.1
External Alarm, Reference, Monitoring, and Control Connection Points Locations
Refer to
Figure 5-3:
External Alarm, Reference, Monitoring, and Control Connection Points Locations
5.5.2
Remote Sense (not implemented at this time)
Connect remote sense leads to J1-5 and J1-6, if desired. Observe correct polarity. Refer to
5.5.3
EPO Signal
Connect a normally open external EPO (Emergency Power Off) switch to J1-3 and J1-4, if desired. Switch closure causes the SCC
controller to send an SNMP trap, wait two (2) seconds, and then send a message to shut down the rectifiers. Refer to
5.5.4
Imminent Power Fail Alarm
Contacts close between J1-1 and J1-2 when an imminent power fail alarm occurs. This alarm signals when the combination of
rectifiers and batteries on the bus can no longer support the load. Refer to
and SCC Controller Instructions
(UM1M520HNA) for details.
5.5.5
SCC Controller Ethernet Connection
Connect the SCC controller’s Ethernet port (labeled RMS) to an RMS (Rack Management System). Refer to
NOTE!
The SCC controller supports a 10M Ethernet connection.
J1 (Screw Compression Terminal Block)
Wire Size Capacity:
22-12 AWG.
Recommended Torque:
0.34 Nm (3 in-lbs.)
Rear
(List 01 Shown, other Lists Similar)
CAN Bus
Power Fail
Inputs from
Expansion
Assemblies
RJ-45 to RMS
(10M Ethernet Port)
J1-6:
J1-5:
Remote Sense
(not implemented
at this time)
J1-4:
J1-3: EPO Signal
J1-2:
J1-1:
Imminent
Power Fail Alarm