![Vertiv NetSure ITS Series Installation And User Manual Download Page 13](http://html1.mh-extra.com/html/vertiv/netsure-its-series/netsure-its-series_installation-and-user-manual_1008117013.webp)
Vertiv™ NetSure™ ITS 12V DC Power Shelf Installation & User Manual
5
4.4
Installing Shipping Support Bracket
An Open Compute Rack shipping support bracket is available which allows a module mounting assembly to be integrated into an
Open Compute Rack and then shipped to its final destination with rectifier modules installed.
REMOVE SHIPPING SUPPORT BRACKET BEFORE POWERING SYSTEM.
Procedure
1.
Insert rectifier modules and SCC controller into the module mounting assembly. For SCC controller installation instructions,
refer to SCC Controller Instructions (UM1M520HNA). For rectifier module installation instructions, refer to rectifier module
Instructions (UM1R123000).
2.
Refer to
and install P/N 561578 Open Compute Rack shipping support bracket.
Figure 4-3:
Installing P/N 561578 Shipping Support Bracket
Front
Front
P/N 561578
(Open Compute Rack
Shipping Support Bracket)