Vertiv | Liebert XDH | User Manual
21
Mechanical Installation (Site Preparation)
Fixing the cabinet
There are two holes on each side of the top, bottom, front, and rear, as shown in
. Four bottom holes
are bolted to the floor bracket in the equipment room. After four top holes are bolted, they can be connected to
the top bracket in the equipment room.
3.3.3.Assembly of Cabinet Parts
Assembling the parts of the cabinet which are supplied with XDH units. There are four combined cabinet parts
at the end filter side (each on the left, right, front and rear) and two combined cabinet parts on the fan side
(each at top and bottom). Refer
Section 3.4.1
for assembly procedure.
•
Level the cabinet before paralleling the cabinets and refer
Leveling the Cabinet for the leveling
method.
Procedures for fixing the cabinet:
1. Remove the L-shaped combined cabinet part from the unit accessories kit.
shows magnified
view of the L-shaped combined cabinet parts in position A (left).
2.
Use M5 countersunk screw to fix the parallel cabinet kit (L-shaped) to the XDH unit frame (hinge side)
through the mounting holes on the neighboring cabinet frame, as shown in
.
No. Description
No.
Description
1
Mounting screw M5x12
2
Parallel kit
Figure 3-10 Paralleling the Cabinets using Combined Parts
3.
Use the same method to fix the other parallel cabinet kit.