Mechanical Installation
23
Table 2-9 Diameter of the Suction Pipe
Rated Cooling Capacity of Single
Vertiv
™
Liebert
®
XDC System (kW)
Equivalent Pipe Length -
L (m)
Suction Pipe
L3 - OD (m)
35≤A≤50
0-20
25
20-40
28
40-60
32
50 <A≤65
0-20
28
20-40
32
40-60
35
Table 2-10 Diameter of Branch Gas Pipe and Branch Liquid Pipe
Rated Cooling Capacity
of Terminal (kW)
Equivalent Pipe Length
- L (m)
Branch Liquid Pipe
L4 - OD (m)
Branch Gas Pipe
L5 - OD (m)
XDV010
0-20
12.7
19
20-40
12.7
22
40-60
16
22
XDO020
0-20
16
22
20-40
16
25
40-60
19
28
XDH030
0-20
16
22
20-40
16
25
40-60
19
28
The wall thickness requirements of copper piping at site are shown in
.
Table 2-11 Wall Thickness Requirements of Piping
Piping Size (Outer Diameter mm)
Wall Thickness (mm)
16
≥1
19
≥1
22
≥1
25
≥1.1
28
≥1.2
32
≥1.5
35
≥1.5
Note: The sizes of copper piping are shown in
it must be a hard pipe (Y) specified in the national standard
GB/T18033-2007. If a semi-hard or soft copper pipe is used at the site, consult Vertiv technical team for the wall