Vertiv
|
eSure™ MPPT Solar Converter Module User Manual (UM1S482000E3)
|
Rev. J
19
OPERATION
DC Input Protection Device Requirements/Recommendations
Refer to the system documentation supplied with the system the solar converter is installed in.
Local Indicators
Location and Identification: Refer to
Description: There are three (3) indicators located on the solar converter’s front panel. The functions of these
indicators are as shown in
NOTE!
DC voltage must be present at the solar converter output terminals (from battery or an
operating solar converter) or DC voltage at the input terminals.
Figure 6:
Local Indicator Locations
Solar Converter High Voltage Shutdown and Lockout Restart
Procedure
1.
Remove the solar converter, wait 30 seconds or more (until the LEDs on the solar converter extinguish),
then re-insert the solar converter.
Protection Indicator (Yellow)
Alarm Indicator (Red)
Power Indicator (Green)