4.12 Baying Gasket Kit: E4013
NOTE: The kit is for 24-in. wide spacing only.
When baying racks together on 24-in. centers, use a Baying Gasket Kit to seal the gap between the racks
to maintain proper hot-aisle/cold-aisle best practices. The gasket must be installed before baying racks.
To install the gasket:
1. Measure and cut gasket to length.
2. peel adhesive backing from the gasket, and place the gasket around side perimeter of one of
the racks.
3. Position the racks next to each other with the gasket between them.
The racks are ready for baying.
Figure 4.15 Baying gasket location
Vertiv
| DCE Installer/User Guide |
38
Summary of Contents for DCE 42811
Page 1: ...DCE Rack System Installer User Guide...
Page 4: ...Vertiv DCEInstaller User Guide 4...
Page 6: ...Vertiv DCEInstaller User Guide 6 This page intentionally left blank...
Page 8: ...Vertiv DCEInstaller User Guide 8 This page intentionally left blank...
Page 40: ...Vertiv DCEInstaller User Guide 40 This page intentionally left blank...
Page 41: ......