Vertiv™ NetSure™ IPE Series -48 VDC Outdoor Rectifier Installation and User Manual
Proprietary and Confidential © 2022 Vertiv Group Corp.
73
5
Initially Starting and Checking Rectifier Operation
5.1
Initially Starting the Rectifier
Procedure
1.
Verify all customer side DC load output connections are properly terminated, carefully paying attention to +/- DC polarity
at the output. Customer must verify DC polarity output to load before energizing rectifier.
2.
With battery power disconnected by placing the battery ON/OFF switch to the Off position, apply AC input power to the
rectifier by closing the external AC disconnect or protective device. The rectifier starts automatically.
3.
Apply battery power to the system by placing the battery ON/OFF switch to the ON.
5.2
Checking Rectifier Status
Procedure
1.
Observe the status of the local indicators (visible from the outside through a window located on the left side of the
rectifier). If operating normally, the status of these is as shown in Table 5.1. See Figure 6.1 for location.
Table 5.1 Status and Alarm Indicators
Indicator
Normal State
Status (Green)
On
Observation Alarm (Yellow)
Off
Critical or Major Alarm (Red)
Off
5.3
Checking Battery Status
The battery connection and charging status can be verified via Bluetooth APP.