![Vermont Castings TrimWorks 36DVBGTKCB Installation Instructions Download Page 2](http://html1.mh-extra.com/html/vermont-castings/trimworks-36dvbgtkcb/trimworks-36dvbgtkcb_installation-instructions_1005828002.webp)
2
30003743
�����
��������������������
�����
Top Edge
of Glass
Frame
Assembly
KT697
Fig. 4
Place main body section of bay on top edge of glass
frame assembly.
�����
������������������
�����
Main Body
Section
Measure
Here
Finished
Floor
KT698
Fig. 5
Measure from underside of bay to finished floor.
4. Loosen the 8 screws on the bottom flange, but do
not remove, and lower the bottom flange down by
the amount you measured minus 1/16”. Retighten
screws. (Fig. 6)
Example:
1” - 1/16” = 15/16”
(15/16” is the amount to move flange down)
5. Place the main body section back onto fireplace
unit. Make sure the unit is resting on the top surface
of the glass frame and not the finished floor. If it is
resting on the finished floor then repeat Steps 3 and
4 so that you have a 1/16” gap between the bottom
flange and the finished floor.
�����
��������������������
�����
Loosen Screws
KT699
Fig. 6
Loosen screws to adjust bottom flange.
�����
��������������
�����
Top Heat Deflector
Shield
KT744
Fig. 3
Install top heat deflector shield.
Installation Instructions
1. Place the main body section of the bay onto the
fireplace unit so the flanged edge of the bay rests on
top of the glass frame assembly. (Fig 4)
2. Measure the underside of the bay to the finished
floor. (Fig. 5) This measurement will be used when
adjusting the bottom flange.
3. Carefully remove the main body section and place
face down on a protective surface.