DVBH7 Series Direct Vent Gas Fireplace
54D8001
19
VeRtIcAl SIDeWAll INStAllAtIoN -
tWISt locK pIpe
Step 1
Locate vent opening on the wall. It may be necessary to
first position the fireplace and measure to obtain hole lo-
cation. Depending on whether the wall is combustible or
noncombustible, cut opening to size.
Figure 28
(For com-
bustible walls first frame in opening.)
Note:
When using flex vent, the opening will have to be
measured according to the 1/” (13 mm) rise in 1” (305
mm) vent run.
combustible Walls:
Cut a 9
B\,
”H x 9
B\,
”W (44 x 44 mm)
hole through the exterior wall and frame as shown.
Figure
28
Noncombustible Walls:
Hole opening must be 7
Z\x
” (191
mm) in diameter.
VeNtING INStAllAtIoN
VO584-100
Vent Opening
2/99 djt
Vent opening for combustible Walls
9
B\,
”
(44 mm)
Min.
Fireplace Hearth
Framing Detail
opening for Noncombustible Wall
7
Z\x
”
(190 mm)
Fireplace Hearth
FP93
Figure 28 -
Locate vent opening on wall.
9
B\,
”
(44 mm) Min.
Step 2
Secure firestop to the inside frame, center in the 9
B\,
" x
9
B\,
" vent opening.
Step 3
Place fireplace into position. Measure the vertical height
(X) required from the base of the flue collars to the center
of the wall opening.
Figure 29
Step 4
Using appropriate length of pipe section(s) attach to fire-
place with three (3) screws. Follow with the installation of
the inner and outer elbow, again secure joints with three
(3) sheet metal screws.
X
X
Figure 29 -
Vertical Height Requirements
FP1181
Step 5
Measure the horizontal length requirement including a ”
(51 mm) overlap, i.e. from the elbow to the outside wall
face plus ” (51 mm) (or the distance required if installing
a second 90° elbow).
Figure 30
Always install horizontal venting on a level
plane.
Step 6
Use appropriate length of pipe sections - telescopic or
fixed - and install. The sections which go through the wall
are packaged with the starter kit, and can be cut to suit if
necessary.
X
X
Figure 30 -
Horizontal Length Requirements
FP118