Verify that the Power On LED on the control panel on the front of the shelf
is green.
7
If you have three Expansion shelves, turn on the third shelf.
■
Verify that the Power OK LEDs on the power supply modules are green.
■
Verify that the Power On LED on the control panel on the front of the shelf
is green.
8
Turn on the Primary Storage Shelf. Verify that the Power OK LEDs on the
power supply modules are green.
■
Verify that the Power OK LEDs on the power supply modules are green.
■
Verify that the Power On LED on the control panel on the front of the shelf
is green.
9
Turn on the compute node with the power button on the front right side.
10
Verify that the LED under the button is green.
Configuring the IPMI port from the Access
Appliance shell menu
This section explains how to configure IPMI from the Access Appliance shell menu.
If you have more than one node in your system you must configure each node’s
IPMI port individually.
71
Hardware installation procedures
Configuring the IPMI port from the Access Appliance shell menu