3
Connect one cable to one PDU strip.
4
Connect the other cable to the other PDU strip.
See
“Turning on the hardware and verifying operation”
on page 56.
Turning on the hardware and verifying operation
The appliance and the storage shelves must be turned on in a specified order. If
the hardware is not turned on correctly the appliance RAID controller may not
recognize some storage units.
56
Installation procedures
Turning on the hardware and verifying operation
Summary of Contents for 5250
Page 1: ...Veritas 5250 Appliance Hardware Installation Guide ...
Page 46: ...46 Installation procedures Connecting an appliance to more than one storage shelf ...
Page 47: ...47 Installation procedures Connecting an appliance to more than one storage shelf ...
Page 53: ...53 Installation procedures Connecting an appliance to more than one storage shelf ...
Page 151: ...V Veritas Remote Management interface accessing 70 151 Index ...