background image

Components for installing the storage shelves

Components for installing the rack rails and the node

Verita

s

 5250 D Series Appliance 

Quick Start Guide

STEP 1: INSTALL STORAGE SHELVES

1.1

2.1

1.2

1.3

Node (x1)

Node rails (x2)

Bezel (x1)

Storage rails (x2)

Storage shelf 

(x1)

Hook and loop straps

*optional

Position one of the rail’s rear flange in  
the rear of the rack post and align it to  
two Rack U spaces and press it into the 
holes. There will be an audible “click” that 
assures correct placement. Repeat this 
process on the other side of the rack.

Repeat this process at the front rack  
post on the same sides of the rack as the 
above step. Ensure the alignment of the 
Rack U spaces and press it in the same way  
as above step ensuring an audible

 click

.

If a change in location on the rack is  
required, pull on the blue release latch  
on each rail to unseat the rails. 

Click

STEP 2: INSTALL DISK STORAGE SYSTEM

Align the disk storage system to the rails and slide it 
in, rear side first, until the screws on the front of the 
system are tight with the front flanges of the rails.

2.2

Tighten the thumbscrews on the system until they stop. 

Summary of Contents for 5250 S Series

Page 1: ...e right rail Do not over tighten the screws Left front Right front Left front Left back 1 4 1 5 Remove the ear caps Insert one screw at the bottom of the rails at each side of the shelf Do not over tighten the screws If installing a bezel do not replace the ear caps Install more storage shelves as needed then proceed to node installation With the front of the storage shelf bezel facing you place t...

Page 2: ...tend the rails to expose the white pull tab on the inner rail Pull the white tab forward to release the inner rail from the outer and intermediate rails Attach the inner rail to the left and right sides of the chassis at the four attachment locations The rails click into place when properly installed 1 2 3 4 2 3 1 4 Identify the three different rails in each rail assembly Outer rail Inner rail Int...

Page 3: ...the chassis Rotate the key counter clockwise until it stops which is past the lock icon in the 11 o clock position Secure the captive screws onto the node ears Copyright 2022 Veritas Technologies LLC All rights reserved Once you have installed the storage shelves node rack rails and node refer to the cabling guide to connect the hardware ...

Page 4: ...assures correct placement Repeat this process on the other side of the rack Repeat this process at the front rack post on the same sides of the rack as the above step Ensure the alignment of the Rack U spaces and press it in the sameway as above step ensuring an audible click If a change in location on the rack is required pull on the blue release latch on each rail to unseat the rails Click STEP ...

Page 5: ... and back of the rail to fit into the rack Slide the rail forward until the pins click into the rack holes Secure the rear of the rail Push the blue lock located on the outside of the rail toward the rack wall and toward the back of the rail The lock must be behind the rack post Ensure that the lock clicks into place Left rear Right rear Extend the rails to expose the white pull tab on the inner r...

Page 6: ...ardware from being fully pushed into the rack Pull the blue tab forward to unlock the intermediate rail and continue sliding the node into the rack Angle in the right side of the bezel so that the upper and lower tabs on the right side engage with the corresponding holes on the chassis Rotate the key counter clockwise until it stops which is past the lock icon in the 11 o clock position Secure the...

Reviews: